A turnkey wind LiDAR campaign means one operator owns the chain from site plan to QC’d data — so developers are not stitching together logistics, power, telecoms and data cleaning.
Four stages
1. Plan
Measurement objectives, heights, duration, access, power and communications.
2. Deploy
Transport, install and commission the LiDAR and autonomous power system with documented handover.
3. Monitor
Remote monitoring of uptime, data flow and anomalies — with intervention when something drifts.
4. Deliver
Structured datasets, availability metrics and campaign reporting throughout the project.
Who it is for
Onshore wind developers, owners preparing repowering, and advisors who need rotor-height measurements without building an internal measurement ops team.
Favionus — Bucharest-based, Europe campaigns — [email protected]
